Tag: Robi Axiata

  • Banglalink and Robi Split over 8.4 MHz E-GSM Spectrum Auction Timeline

    Banglalink and Robi Split over 8.4 MHz E-GSM Spectrum Auction Timeline

    Bangladesh’s telecom regulator will proceed with an auction of 8.4 MHz in the E-GSM band this year. It is pushing ahead despite conflicting demands from rivals Banglalink and Robi Axiata.

    At issue are frequencies running from 880 MHz to 888.4 MHz. Carriers need this low-band slice to deepen indoor 4G coverage and expand rural reach across Dhaka and regional districts.

    Banglalink petitioned the Bangladesh Telecommunication Regulatory Commission on September 21 to freeze all major spectrum decisions. Chief Corporate and Regulatory Affairs Officer Taimur Rahman represented the operator. He argued that releasing frequencies before the government finishes its new Telecommunications Policy risks creating structural inefficiencies. That draft policy is expected to allow active infrastructure and spectrum sharing among carriers. Such rules could alter how much raw spectrum each operator needs to hold.

    Robi Axiata took the opposite stance in a September 24 letter. Chief Executive Officer Ziad Shatara urged the regulator to assign the E-GSM airwaves immediately to relieve network congestion. Pricing disputes can wait for the November 2026 spectrum renewal round, he argued. Robi also told the commission that any assigned spectrum must be contiguous to justify fresh capital expenditure.

    Balance Sheets and Spectrum Scarcity

    This clash between Bangladesh’s second and third largest mobile operators reflects differing network assets. Per-operator spectrum allocations in the country remain among the lowest in South Asia. Dhaka’s mobile carriers operate on thin margins and low average revenue per user. Every administrative pricing decision strains their capital allocation.

    An operator with adequate sub-1 GHz capacity has an economic incentive to stall auctions until sharing rules become clear. By contrast, a carrier facing immediate cell-site bottlenecks must secure low-band megahertz regardless of policy ambiguity. For suppliers, tower companies, and corporate investors, regulatory timing in Bangladesh directly dictates infrastructure spending cycles.

    Regulator Holds the Line

    BTRC Chairman Major General Md Emdad-Ul-Bari (Retd) confirmed that the commission will stick to its timetable. The agency has already secured ministry approval to set reserve pricing.

    “This has nothing to do with the policy. The government has given permission to set the pricing for the auction, noting that it is within BTRC’s jurisdiction.”

    Moving ahead without industry consensus brings execution risks for the state. If only one private operator bids alongside state-owned Teletalk and market leader Grameenphone, auction revenue could fall short of government fiscal targets.

    Precedents in South Asian Spectrum Sales

    Administrative floor prices have repeatedly complicated spectrum auctions in Dhaka. In previous allocation exercises, Bangladeshi carriers fought government valuation benchmarks. They argued state fee structures failed to reflect real commercial returns on mobile data.

    The current E-GSM plan dates to April. That month, the BTRC resolved to auction the 880 MHz to 888.4 MHz band to support rising data traffic and prepare networks for broader rollouts. That decision revived a debate over whether sub-900 MHz capacity should be awarded piecemeal or bundled into a broader reassignment across the telecom sector.

    The November 2026 Renewal Window

    Next comes the BTRC’s formal publication of the E-GSM auction guidelines and reserve prices ahead of the bidding rounds later this year.

    Carriers will weigh those auction terms against the wider spectrum license renewals due in November 2026. Those upcoming renewals will determine how much capital mobile operators can commit to expanding their networks.

  • Dhaka Telecom Thefts Mount as Mobile Operators Report 170 Base Station Losses

    Dhaka Telecom Thefts Mount as Mobile Operators Report 170 Base Station Losses

    Bangladesh mobile operators lost 170 base station cards and thousands of metres of power cables in Greater Dhaka this year. The spike prompted an urgent petition to regulators for police protection.

    Site thefts during the first eight months of 2026 jumped sharply from the 47 base transceiver station cards stolen across the country throughout 2025.

    The Association of Mobile Telecom Operators of Bangladesh lodged an appeal on September 16 with the Bangladesh Telecommunication Regulatory Commission. The industry group called on the regulator to coordinate with national law enforcement agencies to break up criminal networks targeting cell tower hardware. Stolen components include remote radio units, power cables, base transceiver station cards, feeder cables, and backup lithium and lead-acid batteries.

    Losses hit both private carriers and state-run infrastructure across industrial and residential zones. Incidents concentrated heavily in Mohammadpur, Badda and Lalbagh within Dhaka, alongside peripheral manufacturing hubs in Narayanganj, Narsingdi, Savar and Gazipur. Grameenphone reported 75 BTS cards stolen through August, up from six in 2025. Robi Axiata recorded 48 stolen cards against 10 in the previous year. Banglalink lost 29 cards compared with nine in 2025. State-owned Teletalk reported 18 stolen cards, down slightly from 22.

    The Breakdown Across Dhaka Towers

    Power transmission cabling forms the second major target for scrap and resale rings operating around the capital. Grameenphone reported losing 507 metres of power cable by August, compared with 153 metres in 2025. Robi lost 417 metres, up from 211 metres. Banglalink recorded 291 metres lost against 189 metres last year. Teletalk reported the heaviest physical losses, with 6,749 metres of power cable cut and stolen from its installations by August.

    Active transmission gear suffered heavy losses as well. Robi logged 157 stolen remote radio units during the eight-month span, compared with 44 across all of 2025. Teletalk lost 76 units. Banglalink and Grameenphone reported 41 and 33 stolen units respectively. Battery losses totalled 756 units across the industry up to August. Teletalk accounted for 452 units, while Robi recorded 253.

    Operational Fallout for Digital Commerce

    Stripped equipment creates direct operational bottlenecks for digital commerce and retail transactions. When thieves sever power cables or pull base station cards, towers drop offline immediately. Backup generators and batteries cannot bridge the gap when auxiliary electrical systems are stripped simultaneously. For suburban retail clusters, mobile financial service agents and distribution warehouses, blackouts halt point-of-sale systems, digital wallet transfers and real-time inventory tracking.

    Replacing active radio units and base station electronics presents a steeper challenge than standard line repairs. Tower operators cannot source specialized radio frequency modules or brand-specific station cards from domestic retail suppliers. Carriers must draw on imported spare parts inventories. They burn cash on unplanned capital expenditure while waiting on international shipments that face customs clearances and shipping lead times.

    During the last 20 months, approximately 16,000 metres of power cable, more than 2,000 batteries, and over 500 RRUs have been stolen.

    Security Measures and Scrap Market Networks

    Carriers have deployed reinforced physical enclosures, electronic tamper alerts and closed-circuit monitoring at high-risk rooftop and ground sites. These measures raise capital costs per tower without eliminating breaches by well-equipped scrap rings. Industry representatives point out that stopping tower theft requires targeting the secondary market of illicit buyers, scrap metal aggregators and unauthorized repair workshops that purchase commercial telecom gear.

    Telecom asset theft in Bangladesh has flared periodically as metal scrap prices and electronics component costs rise. In 2019, industry records showed 2,195 tower theft incidents during 2018. Over the past 20 months, cumulative equipment losses reached roughly 16,000 metres of cable, more than 2,000 batteries and over 500 remote radio units across the four operating networks.

    Regulatory Action and Police Coordination

    Regulators at the telecommunications commission must now decide whether to establish a dedicated multi-agency enforcement task force with district police commands. Operators are tracking whether joint inspection raids on known scrap clearing hubs in Gazipur and Narayanganj begin before the final quarter of the year.

  • Teletalk and Robi sign network sharing deal

    Teletalk and Robi sign network sharing deal

    Bangladesh operators Teletalk and Robi Axiata have arranged to share network sites across the country to improve the network experience for their respective customers.

    The two operators have signed an agreement on the network sharing deal at a meeting this week attended by company executives including Robi CEO Mahtab Uddin Ahmed and Teletalk managing director Kazi Md Golam Kuddus.

    The agreement is also aimed at accelerating the 4G network rollout process once LTE licenses are awarded to mobile operators.

    Bangladesh’s 4G auction is scheduled to take part in February, and is expected to draw participation from the two operators as well as Grameenphone and Banglalink.

    CityCell, which recently had its operations suspended as a result of failure to pay required license and related fees, has also raised the prospect of participating in the auction in order to re-enter the market.

    The auction will encompass spectrum in the 2100-MHz, 1800-MHz and 900-MHz bands. The deadline for applying to take place is January 14 and the auction will be held on February 14. Operators will need to deploy a 4G network nationwide within 36 months as part of the auction terms.